Glossary15/02/25

Ground mount solar: 3 installation requirement to consider for your company

ground mount solar

Quick definition: Ground mount solar installations are photovoltaic systems directly installed on the ground using mounting structures, requiring specific land, structural support, and regulatory compliance for optimal energy generation.

Table of contents

  1. Understanding ground mount requirements
  2. India-specific context
  3. Practical applications
  4. How Neufin can help?
  5. Related terms
  6. FAQs
  7. Additional resources

Understanding ground mount requirements

Ground mount solar installations require three crucial elements for successful implementation:

1. Land requirements and site assessment

  • Minimum land area: 130 square feet per kW of installation
  • Soil quality assessment for foundation stability
  • Proper drainage systems to prevent water logging
  • Shadow analysis to avoid performance issues

2. Structural and mounting specifications

  • Foundation depth: minimum 1-1.5 meters
  • Wind load capacity: 150-180 kmph
  • Galvanized steel or aluminium mounting structures
  • Tilt angle optimization (15-35 degrees based on location)

3. Legal and regulatory compliance

  • Land use permission from local authorities
  • Environmental impact assessment
  • Grid connectivity approvals
  • Safety compliance certificates

India-specific context

In India, ground mount solar installations must adhere to specific guidelines:

  • Ministry of New and Renewable Energy (MNRE) specifications for structure quality
  • State-specific regulations (e.g., Maharashtra requires 7/12 land document)
  • Agricultural land conversion requirements
  • Local DISCOM approval for grid connection

Practical applications

Ground mount solar systems are ideal for:

  • Large-scale commercial installations (>100 kW)
  • Agricultural solar pumping systems
  • Solar parks and utility-scale projects
  • Remote area electrification

How Neufin can help?

Neufin helps you successfully implement ground mount solar for your company and make the switch to renewable energy. We provide the fastest way for companies to buy renewable energy in India. Companies choose Neufin because we provide –

  1. Guaranteed cost savings – Lower your electricity bills without operational headaches.
  2. End-to-end execution – From feasibility to power delivery, we handle everything.
  3. Zero upfront investment options – Easy and flexible financing through Neufin Capital


Ground mount solar installation

Related terms

  • Solar photovoltaic systems
  • Net metering
  • Solar tracking systems
  • Grid connectivity

Frequently Asked Questions (FAQs)

What is the minimum land requirement for a 1 MW ground mount solar plant?

A 1 MW ground mount solar plant typically requires 4-5 acres of land, considering space for panel installation, maintenance access, and auxiliary equipment.

Are there any specific soil requirements for ground mount installations?

Yes, the soil should have adequate bearing capacity (minimum 10 tons/m²) and proper drainage to support the mounting structure foundation.

What permits are required for ground mount solar in India?

Key permits include land use conversion approval, environmental clearance, DISCOM connectivity approval, and local authority construction permits.

Additional resources

  • MNRE guidelines for solar installations
  • State renewable energy development authority websites
  • Solar energy corporation of India (SECI) documentation

Last updated: January 2024

Disclaimer: This information is for general guidance and may vary based on specific locations and regulations. Consult with certified professionals for project-specific requirements.

Get renewable energy for your company.

Submit your details and get a free consultation with Neufin's expert team to start exploring renewable energy for your business.

"*" indicates required fields