Quick definition: Green Open Access is a renewable energy procurement mechanism that allows consumers to purchase power directly from renewable energy generators through the open access system, specifically focusing on green energy sources like solar and wind power.

Table of contents

  1. Understanding Green Open Access(GOA)
  2. Key features and benefits
  3. Regulatory framework in India
  4. Implementation process
  5. Cost implications
  6. Practical applications and challenges
  7. How Neufin can help?
  8. Related terms
  9. FAQs
  10. Additional resources

Understanding Green Open Access(GOA)

It represents a significant shift in India’s renewable energy landscape, enabling businesses to directly source clean energy from renewable generators. This mechanism, introduced through the Green Open Access Rules 2022, simplifies the process of accessing green energy while promoting sustainability and energy independence.

Key features and benefits

The Green Open Access system comes with several distinctive features:

  • Reduced minimum load requirement from 1 MW to 100 kW
  • Simplified application and approval process
  • Uniform banking procedures across states
  • Priority access to the grid for renewable energy
  • Standardized renewable energy certificates

Regulatory framework in India

The Ministry of Power’s Green Open Access Rules 2022 provides the regulatory foundation. Key aspects include:

  • Central nodal agency establishment
  • Standardized procedures across states
  • Defined timelines for approvals
  • Banking provisions for renewable energy
  • Cross-state transaction frameworks

Implementation process

Implementing Green Open Access involves several steps:

  1. Eligibility verification (minimum 100 kW load)
  2. Application submission to state nodal agency
  3. Technical feasibility assessment
  4. Power purchase agreement execution
  5. Metering and infrastructure setup
  6. Commercial agreement finalization

Cost implications

The financial structure includes:

  • Open access charges
  • Transmission and wheeling charges
  • Cross-subsidy surcharge (with possible exemptions)
  • Banking charges for excess generation
  • Metering and infrastructure costs

Practical applications and challenges

Industries and businesses can leverage Green Open Access in various ways:

  • Manufacturing facilities sourcing renewable power
  • Commercial complexes meeting green building standards
  • IT parks implementing sustainable energy solutions
  • Industrial clusters sharing renewable infrastructure

Common challenges include:

  • Regulatory variations across states
  • Grid integration complexities
  • Banking mechanism differences
  • Infrastructure requirements
  • Solution approaches focus on standardization and technology adoption

How Neufin can help?

Neufin helps companies make use of the progressive policy and make the switch to renewable energy. We provide the fastest way for companies to buy renewable energy in India. Companies choose Neufin because we provide –

  1. Guaranteed cost savings – Lower your electricity bills without operational headaches.
  2. End-to-end execution – From feasibility to power delivery, we handle everything.
  3. Zero upfront investment options – Easy and flexible financing through Neufin Capital


Municipal solar financing

Related terms

  • Open Access
  • Power Purchase Agreement
  • Renewable Energy Certificate
  • Cross-subsidy Surcharge
  • Banking Charge

Frequently Asked Questions (FAQs)

What is the minimum power requirement for Green Open Access?

The minimum power requirement is 100 kW, reduced from the earlier 1 MW requirement to make green energy more accessible to smaller consumers.

How does Green Open Access differ from conventional Open Access?

Green Open Access specifically focuses on renewable energy sources and comes with additional benefits like priority grid access and simplified procedures

What are the cost advantages of Green Open Access?

Businesses can benefit from reduced power costs, potential waiver of cross-subsidy surcharges, and long-term price stability through renewable energy procurement.

Can multiple entities aggregate their load to meet the minimum requirement?

No, but multiple facilities of same entity can aggregate their power requirements to meet the minimum 100 kW threshold under Green Open Access rules.

Additional resources

Last updated: February 2025

Disclaimer: This information is for general guidance and may vary by jurisdiction. Consult local authorities and financial advisors for specific requirements.

Get renewable energy for your company.

Submit your details and get a free consultation with Neufin's expert team to start exploring renewable energy for your business.

"*" indicates required fields